See KHON2 story at: http://khon2.com/2015/12/18/city-could-resume-beretania-road-repaving-in-early-2016/
New effort by the City: “We have taken some steps to check earlier in the process and we are going to have during the design phase a lot more potholing and subsurface checks so that we don’t have to stop a contractor once they have already started a project,” said Kroning.
HAPI Member Road and Highways Builder is the contractor.